//SET UP AND PACKDOWN
SET UP
​
1. Build both feet sections (they have end caps on, 4no)​
​
2. Add the lower legs, they are shorter poles with 2 holes in one end, the two holes go at the feet end.
​
3. Add the side bars (no2), now both sides are assembled.
​
4. add the cross bar (no1) and now the frame will stand freely.
​
5. Put the lower cross bar (no3) through the panel, there's a pocket for this at the bottom of the panel.
​
6. Slip the material panel over the frame then connect the male/female L brackets on the lower cross bar then clip on to the upright frame (self explanatory).
​
7. Place the baffle (pipe insulation) in the catch tray, this will stop BB'S rolling out.
​
PACKDOWN
​
Personally, I leave my panels set up and just take the feet off when not in use, they're pretty much flat and can be stored easily in my garage or shed.
When I do pack them down I only half break them down.
​
1. Disconnect the lower cross bar but leave it in the panel with the L connectors attached.
​
2. slip the panel off and roll up with the lower crossbar.
​
3. disconnect the top crossbar (no 1) but leave the L connectors attached.
​
4. disconnect the side bars (no2)
​
5. Disconnect lower legs leaving the top T connectors in.
​
6. Leave the feet as they are with T connector in place.
​
7. with a bit of jiggling the panels will pack down in to the bags this way making setup and pack down easier and quicker in future.
​
​
​
​
Email Support